Gade Valley Viaduct for Geoffrey Osborne Ltd

The multi-span composite viaduct is 450 metres long and carries the M25 motorway between junctions 20 and 21. It comprises twin decks, each of which is formed from 4 open topped steel box girders within an insitu concrete slab.